Blue Terra Journal

  • Home
  • Spaceflight
    SpaceflightShow More
    NASA's SR-1 Freedom spacecraft.
    What Is NASA’s SR-1 Freedom Mission? The First Nuclear Reactor In Space Explained
    March 27, 2026
    Artist's impression of a NASA Moon base.
    NASA Moon Base: How The US Will Spend $20 Billion On This Ambitious Project
    March 25, 2026
    Russia's Soyuz rocket ascending to space.
    Russia’s Progress Spacecraft Suffers Mystery Glitch On Its Way To ISS; What Happened?
    March 23, 2026
    Robert Goddard
    Celebrating Robert Goddard – The Man Who Changed Rocketry 100 Years Ago
    March 17, 2026
    International Space Station gets extension to beat China
    Watch Out China! US Proposes Extending International Space Station Lifespan To 2032
    March 10, 2026
  • Astronomy
    AstronomyShow More
    Meteor spotted over Houston.
    Video Captures 1-Ton Meteor Exploding Over Houston Skies, NASA Releases Statement
    March 22, 2026
    NASA black hole simulation
    Fall Into A Black Hole With This Incredibly Scary Simulation Made By NASA
    March 18, 2026
    Comet C/2026 A1 MAPS
    Comet C/2026 A1 MAPS: What Are ‘Sun-Grazer’ Comets And Why Are They Special?
    March 12, 2026
    Moon is safe from asteroid 2024 YR4.
    The Moon Is Safe! James Webb Space Telescope Rules Out Asteroid 2024 YR4’s Collision
    March 6, 2026
    NASA Moon orbiter
    NASA Prepares To Save Its Orbiter During Total Solar Eclipse On The Moon
    March 3, 2026
  • India
    IndiaShow More
    Shubhanshu Shukla aboard the ISS.
    ISRO Astronaut Shubhanshu Shukla Awarded Ashoka Chakra For Heroic Ax-4 Mission
    February 9, 2026
    ISRO's PSLV lifts off to space.
    ISRO’s PSLV Rocket Suffers Third Stage Failure After Successful Liftoff; Payloads Lost
    January 23, 2026
    Dhruva Space team at ISRO facility.
    India’s Dhruva Space To Launch 10 Missions, Including 1st Northeastern Satellite, On ISRO’s PSLV
    January 12, 2026
    ISRO's PSLV rocket
    ISRO To Seek Redemption With PSLV-C62 Mission Launch On January 12
    January 12, 2026
    ISRO SSLV
    ISRO’s SSLV Rocket Just Got Better After Latest Third Stage Test Fire
    December 31, 2025
  • Artemis
    ArtemisShow More
    NASA Artemis II crew
    NASA’s Christina Koch Turns ‘Space Plumber’ To Fix $30 Million Toilet On Artemis II Mission
    April 3, 2026
    NASA Orion spacecraft
    NASA’s Artemis II Astronauts Are Moon-Bound After Successful Trans-Lunar Injection Burn
    April 3, 2026
    NASA Artemis II lifts off.
    Artemis II Lifts Off! NASA Launches 4 Astronauts To The Moon After Over 50 Years
    April 2, 2026
    NASA's Artemis II astronauts
    NASA Artemis II Launch Live: Watch Humanity Return To The Moon On April 2
    April 2, 2026
    NASA Apollo 8 image
    NASA Artemis II: Why This Moon Mission Is Our Generation’s Apollo 8
    March 30, 2026
  • More
    • About
    • Privacy Policy
    • Terms
    • Contact

Blue Terra Journal

  • Home
  • Spaceflight
  • Astronomy
  • India
  • Artemis
Search
  • Pages
    • About
    • Contact
    • Privacy Policy
    • Terms

Home - Artemis - NASA’s SLS Rocket Rolls Out To The Launch Pad For Artemis II – Here’s What’s Next

Artemis

NASA’s SLS Rocket Rolls Out To The Launch Pad For Artemis II – Here’s What’s Next

Major leap toward Artemis II launch.

Harsh Vardhan
Last updated: February 15, 2026 11:34 AM
Harsh Vardhan
Share
6 Min Read
NASA's SLS rocket
NASA's SLS rocket on its way to the launch pad. Image: NASA
SHARE

 

Contents
  • What’s next for NASA’s SLS rocket?
  • More on NASA’s Artemis II mission

NASA’s Space Launch System (SLS) rocket rolled out to the launch pad on January 17, marking a major milestone towards launch of the Artemis II Moon mission. After a 12-hour journey from the Vehicle Assembly Building to Launch Pad 39B of the Kennedy Space Center, Florida, the rocket is finally standing tall – waiting for the next key procedures prior to liftoff.

Made it.

At 6:42pm ET on Jan. 17, the stacked Artemis II rocket and spacecraft reached Launch Pad 39B after a nearly 12-hour journey from the Vehicle Assembly Building at @NASAKennedy in Florida. pic.twitter.com/lpayqG5wNF

— NASA Artemis (@NASAArtemis) January 18, 2026

Artemis II is NASA‘s first crewed lunar mission since Apollo 17 (1972) and it could launch as soon as February 6. Here’s what’s next before the SLS rocket lifts off for the second time.

What’s next for NASA’s SLS rocket?

In the coming weeks, mission teams will assess critical systems of the 322-feet-tall rocket and the Orion spacecraft – stacked atop SLS – while conducting a wet dress rehearsal. During the rehearsal targeted for February 2, the rocket stages will be fuelled with cryogenic propellant similar to launch day and engineers will safely unload it later.

NASA's SLS rocket at Launch Pad 39B.
NASA’s SLS rocket at Launch Pad 39B. Image: NASA

“In the coming days, engineers and technicians will prepare the Artemis II rocket for the wet dress rehearsal, a test of fueling operations and countdown procedures,” NASA said in a statement. “Targeted for no later than Feb. 2, the team will load the rocket with cryogenic, or super-cold, propellants, run through the countdown, and practice safely draining the propellants from the rocket – all essential steps before the first crewed Artemis mission.”

The teams may also conduct additional wet dress rehearsals if needed and rollback the rocket to the VAB for additional work if required.

NASA's SLS rocket at Launch Pad 39B.
NASA’s SLS rocket at Launch Pad 39B. Image: NASA

The last time SLS rolled out to the pad was in 2022 for the Artemis I mission which launched on November 16. NASA had to roll it back to the VAB three times due to propellant leakage during wet dress rehearsal and unfavorable weather conditions in Florida.

Talking about the rollout, NASA administrator Jared Isaacman posted on X – “There is still a lot work ahead before launch, and we’ll take all the time necessary until we are ready. But the rollout today was a real step towards America’s return to the Moon…and this time, we go to stay.”

For the first time in more than half a century, a rocket and spaceship that will carry astronauts around the Moon is rolling out to 39B.

Today’s rollout is a critical step toward that mission and achieving President Trump’s vision when he first established the Artemis Program.… pic.twitter.com/EX2PkxFsEd

— NASA Administrator Jared Isaacman (@NASAAdmin) January 17, 2026

More on NASA’s Artemis II mission

The Artemis II crew comprises of mission commander Reid Wiseman (USA), mission pilot Victor Glover (USA), mission specialist Christina Koch (USA) and mission specialist Jeremy Hansen (Canada).

NASA Administrator Jared Isaacman with Artemis II astronauts.
NASA Administrator Jared Isaacman with Artemis II astronauts Jeremy Hansen, Christina Koch, Victor Glover and Reid Wiseman (left to right). Image: NASA

While Glover will become the first person of colour to launch on a lunar mission, Koch will be the first woman flying to the Moon. Hansen will also script history as the first Canadian on a lunar mission.

The astronauts will fly around the Moon in the Orion spacecraft and return in approximately 10 days without a lunar landing. The objective is to test Orion’s life support system and other components necessary to survive in deep space. Artemis II is the second lunar mission of the Artemis Program aimed at establishing permanent US presence on the Moon. It will be followed by Artemis III that will see humans walk on the lunar surface for the first time since 1972. While NASA planned to launch Artemis III in 2027, it is reportedly launching no earlier than 2028 due to delays in development of SpaceX’s Starship – tasked with taking humans to the lunar surface.

ALSO READ: NASA’s Artemis II Crewed Moon Mission May Launch On Feb 6 – All The Records It Will Set

ALSO READ: Decoding NASA’s SLS Moon Rocket: A Powerful Launcher With A High Price Tag

TAGGED:Artemis IImoonNASAOrionSLS Rocket
Share This Article
Facebook Pinterest Whatsapp Whatsapp LinkedIn Copy Link Print

Latest News

NASA Artemis II crew
NASA’s Christina Koch Turns ‘Space Plumber’ To Fix $30 Million Toilet On Artemis II Mission
Artemis
NASA Orion spacecraft
NASA’s Artemis II Astronauts Are Moon-Bound After Successful Trans-Lunar Injection Burn
Artemis
NASA Artemis II lifts off.
Artemis II Lifts Off! NASA Launches 4 Astronauts To The Moon After Over 50 Years
Artemis
NASA's Artemis II astronauts
NASA Artemis II Launch Live: Watch Humanity Return To The Moon On April 2
Artemis

You Might Also Like

NASA CHAPEA Mars
Spaceflight

Mars On Earth: Why NASA Is Training Humans To Live Like Martians

November 19, 2025
comet 3I/ATLAS Oort Cloud
Astronomy

ESA Drops Surprise Preview Of Comet 3I/ATLAS Images From JUICE Spacecraft

December 8, 2025
NASA's SLS rocket at launch pad.
Artemis

NASA Ready For Second Wet Dress Rehearsal Of Artemis II Moon Rocket On Feb. 18

February 20, 2026
NASA Artemis 2
Artemis

NASA Stacks Artemis 2 Spacecraft On Moon Rocket; Here’s What’s Next

December 4, 2025
© 2026, Blue Terra Journal
  • About
  • Privacy Policy
  • Terms
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?